Bottleneck radar · September 2026

Memory chips are this month's bottleneck. Contract prices for DRAM and NAND are almost nine times what they were a year ago.

The five biggest cloud buyers spent $586B on capex over their last four reported quarters, 84% more than the year before.

Capex per second at the current run rate $24,533 Latest quarters annualize to $774B a year.

Arcs run from where each input is made to two big US data center markets. Drag to turn the globe.

The globe needs WebGL. The four figures below carry the same data.

This month's call · September 2026

Memory chips. Contract prices for DRAM and NAND are almost nine times what they were a year ago.

Korea exported $40.9B of memory chips in August, up 290% from $10.5B a year earlier, while its system chip exports grew 24%. Most of the memory jump is price. The DDR5 16Gb contract price was $46.50, up 786%, and the NAND contract price was $30.48, up 793%. Hyperscaler capex grew 84% to $586.4B over the last four quarters, so the value of memory exports is growing more than three times as fast as the buildout behind it. Prices move this far only when buyers can't get the volume they ordered, and a new memory fab takes more than a year to add supply.

Tightness by input

Memory chips5/5
Gas turbines4/5
Grid connections3/5
Leading-edge chips3/5

Who makes it

SK Hynix 000660Micron Technology MUSandisk SNDKSamsung Electronics 005930Kioxia 285A

The consensus trade

Nvidia NVDABroadcom AVGOMicrosoft MSFTAlphabet GOOGL/GOOGAmazon AMZNMeta Platforms META

What would prove this wrong

FigureThresholdWhy it matters
Korean memory chip exports for September, due from MOTIR on Oct 1Under +100% y/yA drop from +290% to under +100% in one month would mean prices or volumes are easing faster than a shortage allows.
DDR5 16Gb contract price in the same releaseBelow $46.50, August's levelA falling contract price means supply has caught up with orders.
NAND contract price in the same releaseBelow $30.48The same test for flash, which is most of what Sandisk and Kioxia sell.
Hyperscaler capex over the last four quarters, once the Q3 10-Qs are inGrowth under +50% y/yThe memory orders come from this buildout, so a sharp slowdown in capex would ease the shortage.

Since last month: This is the first note. Made by claude-opus-5-5 on Sep 27 from this month's saved evidence packet, outside the monthly API run, and checked against the same schema.

Picks · updated each US trading day

The picks

Since the Sep 27 call the picks are −47.3%, against −15.2% for the consensus basket and −6.4% for the S&P 500.

Who's in it

Equal weight across the call's owners, bought at the first close after the call is published and held until the next call replaces it. Prices in US dollars, dividends included. Research notes only. Nothing here is investment advice.

TickerCompany and why it's inWeight2026 so farSince the call
000660.KSSK HynixThe leading HBM supplier and a top DRAM maker. It sells almost nothing but memory, so memory prices reach its results directly.20%+69%−41.0%
MUMicron TechnologyThe largest US memory maker, selling DRAM, HBM and NAND. Memory is its whole business.20%+111%−43.0%
SNDKSandiskNAND flash and SSDs, spun out of Western Digital in February 2025. The only pure NAND maker listed in the US.20%+218%−55.9%
005930.KSSamsung ElectronicsA top DRAM, HBM and NAND maker, but phones, displays and its foundry dilute the memory exposure.20%+55%−34.9%
285A.TKioxiaNAND flash, the former Toshiba Memory, listed in Tokyo since December 2024. It shares its fabs with Sandisk through a joint venture.20%+95%−61.6%

2026 so far, in dollars

The picks line is dashed before the call because nobody had picked those stocks yet. The 13F clone has no hindsight in it: it buys each of Situational Awareness LP's filings at the first close after the filing date.

The picks, equal weight13F cloneConsensus AIS&P 500
0%
+200%
+400%
+600%
Called Sep 27
Picks +123.9%S&P 500 +5.9%Consensus AI −7.4%13F clone −7.5%
Dec 31Jun 16Nov 25
Line2026 so farLargest dropSince the call
The picks, equal weight+124%−64% (Jun 22 to Nov 25)−47.3%
13F clone−8%−62% (Jun 22 to Nov 20)−46.6%
Consensus AI (NVDA, AVGO, MSFT, GOOGL, AMZN, META)−7%−22% (Oct 6 to Nov 20)−15.2%
S&P 500 (SPY)+6%−11% (Oct 6 to Nov 20)−6.4%
Show as a table
DatePicks13F cloneConsensus AIS&P 500
2025-12-31+0.0%+0.0%+0.0%+0.0%
2026-01-30+74.2%+25.4%+1.2%+1.5%
2026-02-27+92.0%+23.0%−7.1%+0.6%
2026-03-31+63.6%+14.2%−11.9%−4.4%
2026-04-30+174.6%+74.3%+7.2%+5.7%
2026-05-29+354.3%+110.5%+11.8%+11.2%
2026-06-30+464.7%+112.2%−0.4%+10.1%
2026-07-31+244.6%+44.1%+5.5%+10.1%
2026-08-31+292.6%+57.0%+6.6%+13.1%
2026-09-30+330.2%+75.5%+9.9%+12.7%
2026-10-30+235.1%+29.8%+0.1%+11.7%
2026-11-25+123.9%−7.5%−7.4%+5.9%

Filings the clone followed

BookFiledBought at the close ofPositionsPriced
2025-09-302025-11-14Dec 311998%
2025-12-312026-02-11Feb 1224100%
2026-03-312026-05-18May 192699%
2026-06-302026-08-14Aug 1723100%

Daily closes from Yahoo Finance, adjusted for dividends and splits, to the Nov 25 close. Seoul and Tokyo listings are converted to dollars at each day's rate. 13F books from EDGAR. Left out for lack of a price: Bitfarms Ltd (no ticker), Bloom Energy Corp (no ticker).

Bottleneck Radar
Predictions · checked each US trading day

Predictions

Each of these 13 predictions has a due date and a stated chance of coming true, and they were made at 22:05 UTC on Sep 27, 2026, before any of them could be checked. The code checks each one against the data when it comes due and stamps the result with the time. A result never changes once it's recorded.

Checked
2 of 13
Next: one due Oct 28
Came true
2 of 2
About 1.4 should have, going by the chances
Brier score
0.08
0 is perfect. Saying 50% every time scores 0.25.

When each one comes due

Each dot is a prediction, numbered as in the table below, placed on the day its data is due. It fills in once the code has checked it.

OpenCame trueMissedVoid, no data

The predictions

Chance is how likely each one looked when it was made. A good forecaster's 70% calls come true about 70% of the time, so the score to watch is how the count that came true compares with the count expected. Research notes only. Nothing here is investment advice.

#PredictionDueChanceResult
Is memory still short?
1The DDR5 memory contract price in Korea's September release is $46.50 or higher, where it was in August.Chipmakers would only cut prices once they'd caught up with orders.Oct 180%Void, no dataNo data to check it against by 2026-11-03.
2Korea's memory chip exports for September are at least double what they were in September 2025.This is the September call's first test. Less than double would mean the shortage is easing fast.Oct 192%Void, no dataNo data to check it against by 2026-11-03.
3The NAND flash contract price in the same release is $30.48 or higher, where it was in August.Flash is most of what Sandisk and Kioxia sell.Oct 180%Void, no dataNo data to check it against by 2026-11-03.
Is the buildout still growing?
4Taiwan's electronics export orders for September are up at least 60% on September 2025.They were up 84% in August. Growth under 60% would be a real slowdown in chip demand.Oct 2375%✓ Came true+71%, Oct 20
7Microsoft, Amazon, Alphabet and Meta spend more on capex in July through September than the $165.1B they spent in April through June.Every shortage in the call depends on this spending growing.Nov 688%Open
Is power the next squeeze?
5GE Vernova reports more than 116 GW of gas turbine backlog and reservations for the third quarter.That was the June figure. A longer queue means power for data centers stays scarce.Oct 2885%Open
9GE Vernova's stock beats the S&P 500 between the Sep 28 and Dec 31 closes.If power is the next squeeze, the biggest US turbine maker should gain from it.Dec 3155%Open−18.3 pts so far
13GE Vernova ends 2026 with at least 125 GW of backlog and reservations, the target it set in July.Missing its own target would mean turbine demand is cooling.Feb 570%Open
Do the call and the fund stay on memory?
6The October call names memory as the tightest input again.A call that flips every month wouldn't be worth much.Oct 3180%Open
8Situational Awareness still has at least 40% of its stock book in Sandisk and Micron on September 30.It had 56% in June, and its filings moved into memory before the biggest part of the rally.Nov 1665%Open
Do the picks pay?
10The five September memory picks beat the consensus AI basket between the Sep 28 and Dec 31 closes.The method's main claim is that the companies that own the bottleneck do better than the obvious AI names.Dec 3155%Open−32.6 pts so far
11The same five picks beat the S&P 500 over the same stretch.An index fund is what most people would own instead.Dec 3155%Open−40.9 pts so far
12Before Dec 31, the five picks fall at least 25% from their high since Sep 28.They fell 54% in five weeks this summer. This tests whether swings that size keep happening.Dec 3170%✓ Came true−26%, Oct 16

Set 2026-09 was made by claude-opus-5-5 at 22:05 UTC on Sep 27, 2026. Made from the data in data/2026-09 and prices to the Sep 25 close, before any of them could be checked. Confidence is the chance each one comes true. SHA-256 1871c606ccb4d7a1: the checker recomputes it on every run, and the file history on GitHub shows when it was committed. Last checked at 03:55 UTC on Nov 26, 2026.

Bottleneck Radar
Demand · SEC filings

Demand

The five biggest cloud buyers spent $586B in a year, +84% on the year before. Here is what that money buys in physical terms.

What the capex buys

Each step converts the one before it with a factor from config/assumptions.yaml. 3 of the factors still lack a primary source, so read these as rough sizes.

Capex, last 4 quarters
$586B
+84% y/y
Data center power
15.5 GW
+7.1 GW on the prior year
GPUs
6.5M
+3.0M on the prior year
HBM memory
1.88B GB
+0.86B GB on the prior year
Gas turbine equivalents
36
GE 7HA.03 units, simple cycle

Capex: SEC XBRL cash-flow facts, latest 10-Q or 10-K per company. Conversion factors: Epoch AI, NVIDIA, GE Vernova, Crusoe.

Bottleneck Radar

Capex by company

Quarterly cash capex on one scale. Oracle grew fastest, +235% on the same quarter a year earlier. Oracle's quarters end in Feb, May, Aug and Nov.

Amazon$54.2B
Quarter to Jun '26 · +68% y/y
$30B
$60B
Sep '24Jun '26
Alphabet$44.9B
Quarter to Jun '26 · +100% y/y
$30B
$60B
Sep '24Jun '26
Microsoft$35.8B
Quarter to Jun '26 · +110% y/y
$30B
$60B
Sep '24Jun '26
Meta$30.1B
Quarter to Jun '26 · +82% y/y
$30B
$60B
Sep '24Jun '26
Oracle$28.5B
Quarter to Aug '26 · +235% y/y
$30B
$60B
Nov '24Aug '26
Show as a table
CompanyQuarter endCapex
Amazon2024-09-30$22.6B
Amazon2024-12-31$27.8B
Amazon2025-03-31$25.0B
Amazon2025-06-30$32.2B
Amazon2025-09-30$35.1B
Amazon2025-12-31$39.5B
Amazon2026-03-31$44.2B
Amazon2026-06-30$54.2B
Alphabet2024-09-30$13.1B
Alphabet2024-12-31$14.3B
Alphabet2025-03-31$17.2B
Alphabet2025-06-30$22.4B
Alphabet2025-09-30$24.0B
Alphabet2025-12-31$27.9B
Alphabet2026-03-31$35.7B
Alphabet2026-06-30$44.9B
Microsoft2024-09-30$14.9B
Microsoft2024-12-31$15.8B
Microsoft2025-03-31$16.7B
Microsoft2025-06-30$17.1B
Microsoft2025-09-30$19.4B
Microsoft2025-12-31$29.9B
Microsoft2026-03-31$30.9B
Microsoft2026-06-30$35.8B
Meta2024-09-30$8.3B
Meta2024-12-31$14.4B
Meta2025-03-31$12.9B
Meta2025-06-30$16.5B
Meta2025-09-30$18.8B
Meta2025-12-31$21.4B
Meta2026-03-31$19.0B
Meta2026-06-30$30.1B
Oracle2024-11-30$4.0B
Oracle2025-02-28$5.9B
Oracle2025-05-31$9.1B
Oracle2025-08-31$8.5B
Oracle2025-11-30$12.0B
Oracle2026-02-28$18.6B
Oracle2026-05-31$16.5B
Oracle2026-08-31$28.5B

SEC XBRL company facts: PaymentsToAcquirePropertyPlantAndEquipment (Amazon: PaymentsToAcquireProductiveAssets). Year-to-date values are differenced into quarters.

Bottleneck Radar

Guidance in the filings

We anticipate 2026 capital expenditures, including principal payments on finance leases, to be in the range of $130-145 billion, narrowed from our prior outlook of $125-145 billion.Meta, earnings release filed 2026-07-29
Supply · trade data and filings

Supply

Korean memory exports are up 3.9x on the year. GE Vernova has about 9.7 years of turbine orders booked.

Memory chips

Korea shipped 3.9 times as much memory in August as a year earlier.

Korean memory chip exports
$40.9B
August 2026 · +290% on $10.5B
All Korean chip exports
$46.6B
+209% y/y
DDR5 16Gb contract price
$46.50
+786% y/y
NAND 128Gb contract price
$30.48
+792% y/y

Korean trade ministry (MOTIR) monthly release, page and PDF. Figures converted from 억 달러 (US$100M).

Bottleneck Radar

Taiwan export orders

Electronics orders were $45.8B in August, +84% on the year. Orders measure demand for Taiwanese electronics, so they stand in for chips until a direct supply series exists.

ElectronicsICT products
$10B
$20B
$30B
$40B
$50B
Electronics $45.8BICT $34.2B
Sep '23Mar '25Aug '26
Show as a table
MonthElectronicsICT products
2023-09$17.2B$16.4B
2023-10$18.8B$17.5B
2023-11$17.8B$16.2B
2023-12$14.9B$12.3B
2024-01$17.4B$13.9B
2024-02$13.2B$10.4B
2024-03$16.5B$13.3B
2024-04$17.1B$13.0B
2024-05$16.9B$14.1B
2024-06$15.5B$12.7B
2024-07$18.1B$14.1B
2024-08$17.8B$14.1B
2024-09$19.0B$17.6B
2024-10$20.9B$17.6B
2024-11$19.1B$15.8B
2024-12$19.9B$15.3B
2025-01$18.3B$12.4B
2025-02$20.8B$14.6B
2025-03$21.1B$15.5B
2025-04$24.6B$16.6B
2025-05$23.1B$19.4B
2025-06$22.5B$18.8B
2025-07$24.1B$17.6B
2025-08$24.9B$17.1B
2025-09$27.7B$23.4B
2025-10$28.4B$22.6B
2025-11$28.2B$26.8B
2025-12$27.9B$28.7B
2026-01$32.6B$25.1B
2026-02$26.2B$22.7B
2026-03$36.7B$34.3B
2026-04$35.9B$31.5B
2026-05$37.2B$32.4B
2026-06$40.5B$34.2B
2026-07$41.3B$33.3B
2026-08$45.8B$34.2B

Taiwan Ministry of Economic Affairs open data, US$ millions a month (electronics, ICT).

Bottleneck Radar

Gas turbines

GE Vernova has 116 GW committed, 9.7 years of shipments at its latest quarterly pace. Years of shipments divides backlog plus reservations by the latest quarter's shipments times four.

Firm backlogSlot reservations
GE Vernova9.7 years of shipments
116 GW
Siemens Energy4 years of shipments
95 GW
Mitsubishi Heavy Industriesshipments not disclosed
35 GW
Show as a table
MakerFirm backlog (GW)Slot reservations (GW)As ofSource
GE Vernova53632026-Q2parsed
Siemens Energy69262026-06-30manual
Mitsubishi Heavy Industries3502026-06-30manual

GE Vernova: earnings release on EDGAR, parsed. Siemens Energy and MHI: entered by hand from their results decks. MHI doesn't report reservations or shipments in GW.

Bottleneck Radar

Grid connections

Batch Zero replaced ERCOT's legacy large-load study process in July 2026. A Governor's directive on Aug 3, 2026 about data center and crypto-mining interconnections added a verification and audit step, with a TBD effect on the Batch Zero timeline.

Qualified as base load
66.4 GW
204 projects
Qualified as studied load
127.9 GW
158 projects

ERCOT Batch Zero update of 2026-09-11 (PDF), entered by hand.

Bottleneck Radar
Positioning · 13F

The fund's book

56% of Situational Awareness LP's long stock book sits with memory makers, as of June 30, 2026.

Book by input

Memory 55.8%Chips and packaging 6.3%Power and grid 9.4%Other 28.5%

Largest positions

SNDKSandisk Corp
28.1%
MUMicron Technology Inc
27.6%
BEBloom Energy Corp
9.4%
TSMTaiwan Semiconductor Manufac
6.3%
NBISNebius Group N.V.
6.1%
CRWVCoreweave Inc
3.7%
CORZCore Scientific Inc New
3.3%
STMStmicroelectronics
2.9%
APLDApplied Digital Corp
2.3%
RIOTRiot Platforms Inc
2.3%
SHAZSharonai Holdings Inc
2.3%
IRENIren Limited
2.1%
11 othersSmaller positions
3.5%
Show as a table
TickerCompanyValueWeight
SNDKSandisk Corp$5.7B28.13%
MUMicron Technology Inc$5.6B27.64%
BEBloom Energy Corp$1.9B9.41%
TSMTaiwan Semiconductor Manufac$1.3B6.27%
NBISNebius Group N.V.$1.2B6.11%
CRWVCoreweave Inc$744.5M3.69%
CORZCore Scientific Inc New$665.6M3.30%
STMStmicroelectronics$584.3M2.90%
APLDApplied Digital Corp$469.0M2.33%
RIOTRiot Platforms Inc$468.2M2.32%
SHAZSharonai Holdings Inc$456.8M2.27%
IRENIren Limited$433.3M2.15%
CLSKCleanspark Inc$178.6M0.89%
KEELKeel Infrastructure Corp$151.8M0.75%
SEISolaris Energy Infras Inc$90.9M0.45%
WYFIWhitefiber Inc$68.3M0.34%
BTDRBitdeer Technologies Group$54.6M0.27%
TET1 Energy Inc$46.5M0.23%
HIVEHive Digital Technologies Lt$33.2M0.16%
BWBabcock & Wilcox Enterprises$28.6M0.14%
PUMPPropetro Hldg Corp$28.1M0.14%
VSHVishay Intertechnology Inc$20.2M0.10%
CBRSCerebras Systems Inc$2.2M0.01%

13F information table filed 2026-08-14 (EDGAR), tickers from OpenFIGI. A 13F arrives 45 days after the quarter ends and leaves out shorts, cash and leverage.

Bottleneck Radar
Method

How it's built

Code pulls every number. A model only writes the monthly call.

Each month a script pulls hyperscaler capex from SEC filings, memory exports from Korea's trade ministry, export orders from Taiwan's economics ministry and turbine backlogs from GE Vernova's earnings release, then rebuilds this page. The code, the data and every past month are on GitHub.

Conversion factors

FactorValueNoteStatus
Share of capex spent on AI data centers100%Upper bound. Treats all hyperscaler capex as AI data center spend. Lower it when a better split turns up.assumption
Capex per GW of facility power$37.9BEpoch splits it 69% IT and 30% facility. Nvidia quotes $50-60B per GW all-in on Vera Rubin (Aug 26 2026 call), a useful high case.sourced
Share of power reaching IT (1/PUE)80%Share of facility power that reaches IT load, which is 1/PUE at a PUE of 1.25.unverified
IT power per GPU1.9 kWAll-in IT power per GPU, from a GB300 NVL72 rack at about 135 kW over 72 GPUs, CPUs and networking included.unverified
HBM per GPU288 GBNVIDIA Blackwell Ultra (GB300) and Vera Rubin NVL72 specssourced
Floor space per MW3,300 sq ftOne campus, gross building area over total power. No standard benchmark found.unverified
Power per gas turbine430 MWTurbine-equivalents if every new megawatt came from new simple-cycle units. An upper bound, since grid power and combined cycle need fewer turbines.sourced